Development and releases
Start with migration guidance, then consult development practices and implementation details. Dated measurements and audit notes follow.
- Premise 2.6 release and migration guide
- Premise 2.5 release and migration guide
- Contributing
- Documentation conventions and checks
- Supporting another IAM model
- Heat mapping maintenance
- Inventory and scenario architecture
- Internal implementation reference
- Validation certificates and checkpoints
- Physical inventory probing campaign
- Purpose and scope
- Existing assets and their limits
- 1. Freeze the experiment
- 2. Build the scenario panel in two stages
- 3. Select 5,000 activities with explicit sampling reasons
- 4. Register physical indicators and coverage
- 5. Compute efficiently and verify the arithmetic
- 6. Apply independent physical checks
- 7. Interpret scenario and comparison results
- 8. Verify detector sensitivity with deliberate faults
- 9. Triage findings and inspect unflagged controls
- 10. Implementation and outputs
- 11. Delivery sequence and completion criteria
- Methodological references
- Supplier-selection implementation
- Runtime and resident-memory optimization
- Consequential marginal-mix validation
- Documentation migration and technical audit
- Content migration
- Confirmed and corrected
- Unresolved implementation and source questions
- Verification
- Example execution status
- External-link scan
- Acceptance checks completed
- Second editorial pass: reading order
- Third pass: content, examples and scientific sources
- Fourth pass: consistent sector explanations
- Fifth pass: current implementation and process diagrams
- Scientific update backlog
- Photovoltaics
- Other electricity generation and storage
- Heat and end-use heating
- Biomass
- Hydrogen
- Biofuels
- Synthetic fuels
- Ammonia
- Mobile and stationary batteries
- Transport
- Steel
- Cement
- Metals
- Mining and tailings
- Carbon capture and removal
- Air emissions
- Consequential modelling
- Acceptance for a modelling update
- Hydrogen exchange-floor discrepancy
- Biofuel conversion-efficiency scope
- Passenger-car inventory refresh, October 2026
- Generation choices
- Integration changes
- Controlled EF 3.1 comparison
- Reproduction and artifacts
- Evaporative speciation correction, 13 October 2026
- PAH identity correction, October 13
- Read-only pollutant diagnostics, 13 October 2026
- Cold-start activity update, 13 October 2026
- Regional CNG supply-chain correction, 13 October 2026
- Delivered CNG reference correction
- Final vehicle fuel-carbon accounting
- Hydrogen tank-compression correction
- Hybrid operating-fuel mapping correction
- Regional truck refresh, October 2026